11/5/2022 0 Comments Meaning bank memoranda![]() ![]() details relevant to a network utility operator (for example, vehicle access).stormwater and wastewater utility systems.relevant information from other Acts that has been notified to the territorial authority. ![]() ![]() heritage status and special features (for example, natural hazards).A certificate noting Resource Management Act requirements must be attached to the PIM.A territorial authority may attach a development contribution notice to a PIM.A PIM must include a statement that the New Zealand Historic Places Trust has been notified (where applicable).A PIM must notify the requirement to obtain an evacuation scheme under the Fire Service Act 1975, where necessary.A PIM can be reissued where a territorial authority considers that an error or omission has occurred within the original processing timeframe.The PIM must be issued within 20 working days of receiving an application.There are some important requirements to be aware of: A territorial authority issues a PIM following an application by the owner. A project information memorandum (PIM) provides information about land and about the requirements of other Acts that might be relevant to proposed building work. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |